bolt6. Flash Loan Recycling System

System Overview

The Flash Loan Recycling System is the core innovation of OmniLink, enabling instant cross-chain swaps without requiring user collateral or protocol-owned liquidity.

graph TD
    User([User]) --> SC[Source Chain Interface]
    SC --> FL[Flash Loan Provider]
    FL --> FLH[Flash Loan Handler]
    FLH --> BA[Bridge Adapter]
    BA --> Bridge[Bridge Protocol]
    
    Bridge -.-> DC[Destination Chain]
    DC --> RLP[Recycling Liquidity Pool]
    RLP --> User2([User])
    
    Bridge -.-> |Settlement| RLP

Transaction Lifecycle

1. Source Chain Initiation:

  • User submits transaction to source chain

  • System takes flash loan from provider

  • Tokens are sent to bridge protocol

  • Flash loan is repaid immediately

2. Destination Chain Execution:

  • Destination contract receives request

  • Recycling pool releases tokens to user

  • User receives tokens instantly

  • Operation is marked as pending settlement

3. Background Settlement:

  • Bridge completes token transfer (minutes/hours later)

  • Tokens arrive on destination chain

  • Recycling pool is replenished

  • Operation is marked as complete

Flash Loan Integration

Aave V3 Integration:

dYdX Integration (Ethereum only):

Recycling Pool Mechanics

Pool Flow Diagram:

Pool Health Calculation:

Dynamic Fee Calculation:

Settlement Process

Normal Settlement:

  1. Bridge completes token transfer

  2. Tokens arrive on destination chain

  3. Destination chain contract verifies authenticity

  4. Recycling pool receives tokens

  5. Pool parameters update automatically

Delayed Settlement:

  1. System monitors for settlement timeout

  2. After 6 hours, marks operation for review

  3. Continues attempting settlement

  4. After 24 hours, triggers fallback mechanism

  5. Settlement eventually completes or manual intervention

Failed Settlement (Rare):

  1. Bridge failure is detected

  2. System attempts alternate bridge route

  3. If all bridges fail, insurance fund covers loss

  4. Operation is marked as insurance claim

  5. Admin intervention reviews failure


Next: 🗺️ Development Roadmap Back to: Table of Contents